Back |
---|
Global Santa FeHigh pressure piping system upgrade on Parameswara Rig including mud pump removal and installation together with hull preservation works. June 2002 to March 2003. Works carried out at H&H Tanjung Batu Marine Base. |
||
Back |
---|
Global Santa FeHigh pressure piping system upgrade on Parameswara Rig including mud pump removal and installation together with hull preservation works. June 2002 to March 2003. Works carried out at H&H Tanjung Batu Marine Base. |
||